Limes · X asset graphic review Sovereignty thread · current vs proposed alt · not live on limes.think2earn.com
PREVIEW ONLY · DO NOT REDEPLOY YET

Alternative graphic presentation

Side-by-side review of the seven launch visuals. Production assets on the left; proposed redesigns on the right. Nothing here has been deployed to the live Limes review Worker. Approve any (or all) alts before we promote them.

1600×900 PNG · RGB Geist + Geist Mono Limes brand palette retained Claims / sources unchanged

Slide 01 / 07

01 · Precedent timeline

  • Proportional day axis (Jun 9 → Jul 1)
  • Blue band + badge marks the 18-day interruption
  • Equal-width event cards with leader lines (no collisions)
  • Precedent strip restates the takeaway
Current (live)
Current 01 · Precedent timeline
Proposed alt
Proposed 01 · Precedent timeline

Slide 02 / 07

02 · Policy, not outage

  • Editorial quote with Signal Blue accent bar
  • Key phrase “all our customers” highlighted in context
  • Fact cards with accent ticks and clearer hierarchy
  • Added interpretation line under the quote
Current (live)
Current 02 · Policy, not outage
Proposed alt
Proposed 02 · Policy, not outage

Slide 03 / 07

03 · Compute share

  • Hero KPI cards for each region’s share
  • Europe cells ringed for emphasis in the waffle
  • Stacked proportion bar as a second encoding
  • Tighter legend + estimate disclaimer
Current (live)
Current 03 · Compute share
Proposed alt
Proposed 03 · Compute share

Slide 04 / 07

04 · Capacity vs control

  • Clearer bar pedestal and value placement
  • “>12×” as a navy badge between bars
  • Scenario area fill between ambition and default
  • Year ticks + legend chips for paths
Current (live)
Current 04 · Capacity vs control
Proposed alt
Proposed 04 · Capacity vs control

Slide 05 / 07

05 · Technical base

  • External value labels when bars are short
  • Ratio note: Europe ≈ 73% of US base
  • Growth rates with proportional meters
  • Stronger growth-panel hierarchy
Current (live)
Current 05 · Technical base
Proposed alt
Proposed 05 · Technical base

Slide 06 / 07

06 · Continuity test

  • Continuous process rail with numbered nodes
  • Hanging cards with connector stems
  • Richer step detail (two-line descriptions)
  • Top accent mark on each card
Current (live)
Current 06 · Continuity test
Proposed alt
Proposed 06 · Continuity test

Slide 07 / 07

07 · Public receipts

  • Status color-coding: Public / Early / Foundation
  • Top accent stripe per workstream
  • Clearer type hierarchy and spacing
  • Same honest status language retained
Current (live)
Current 07 · Public receipts
Proposed alt
Proposed 07 · Public receipts